top of page
Steve Headshot Edits.jpg
CV & CONTACT

Steve Bigham

PRINCIPAL CONSULTANT

Phone

971.599.1981

Email: 

steveb@pacifictechnical.net

Address: 

4145 SW Watson Ave., Suite 350
Beaverton, Oregon 97005

Downloadable CV & Contact Card:

  • Steve Bigham LinkedIn
  • White Facebook Icon
Steve Bigham

 

Steve Bigham's career began in 1999 and spans more than two decades as a disaster restoration professional with experience in fire, water, mold, biohazard, and complex restoration projects. 


Since 2015, Steve has worked a variety of diverse consulting projects, and disputes involving estimating, scope identification, forensic invoice analysis, site monitoring, and other restoration related issues on commercial and residential properties.
 

EDUCATION
​EDUCATION

MASTER WATER RESTORER (MWR)

Institute of Inspection Cleaning & Restoration

WATER LOSS SPECIALIST (WLS)

Restoration Industry Association

JOURNEYMAN WATER RESTORER (JWR)

Institute of Inspection Cleaning & Restoration

JOURNEYMAN TEXTILE CLEANER (JTC)

Institute of Inspection Cleaning & Restoration

APPLIED STRUCTURAL DRYING (ASD)

Institute of Inspection Cleaning & Restoration

FIRE & SMOKE RESTORATION (FSRT)

Institute of Inspection Cleaning & Restoration

WATER DAMAGE RESTORATION (WRT)

Institute of Inspection Cleaning & Restoration

UPHOLSTERY & FABRIC TECH. (UFT)

Institute of Inspection Cleaning & Restoration

APPLIED MICROBIAL REMEDIATION (AMRT)

Restoration Consultants

OSHA 10-HR Construction

Summit Training Source

LEVEL 1 THERMOGRAPHER

Infrared Training Center

RESTORATIVE DRYING 201

DRI-EAZ University

CLANDESTINE LAB ASSESSMENT & DECONTAMINATION

Meth Lab Cleanup Co.

SAMPLING AIQ CONTAMINATES

Indoor Air Quality Association

THE FUNDAMENTALS OF IAQ CONTAMINANTS

Indoor Air Quality Association

MOLD REMEDIATION

Indoor Air Quality Association

SUCCESSFUL SUBROGATION I

Claims Training Systems

SUCCESSFUL SUBROGATION II

Claims Training Systems

EXPERIENCE
EXPERIENCE

Clackamas County Mall Shooting

Clackamas, OR

Commercial • 520,000 SF

Provided Project Management and Biohazard Restoration Services following the 2012 shooting spree by Jacob Roberts at a popular suburban mall.

Hotel Alder

Portland, OR

Commercial • 43,000 SF

Provided site documentation, scope verification, project estimates, and invoice analysis following the heavy fire, smoke, water, and mold damages throughout five floors of a historic building in downtown Portland.

The Majestic Theater

San Antonio, TX

Commercial • 69,858 SF

Provided site monitoring, scope verification, and invoice analysis following a domestic water line break above a historical theatre affecting nine floors of residential apartments.

Portland State University

Portland, OR

Educational • 15,000 SF

Provided Project Management and water restoration Services following. The fill sensor on a sub-level fire suppression water tank malfunctioned in the below-grade bookstore flooding the structure overnight with more than 224,415 gallons of water.

The University of Oregon

Eugene, OR

Educational • 100,000 SF

Provided invoice analysis and recommendations following water mitigation repairs from multiple university buildings subsequent a freeze event that damaged numerous domestic water lines throughout the campus.

Coos County Airport

North Bend, OR

Government • 51,914 SF

Provided a repair claim analysis and expert report recommendations. Separated damage costs by loss event. A newly constructed structure received damages occurring from ongoing rainwater leaks throughout construction.

Washington County Courthouse

Hillsboro, OR

Government • 89,040 SF

Provided site documentation, scope verification, project estimates, and invoice analysis following water loss events affecting the Washington County Courthouse and council office spaces in 2016 and 2018.

Good Samaritan Hospital

Portland, OR

Healthcare  55,500 SF

Provided project management and restoration services following a water heater malfunction. Subsequent damage involved three floors of medical office space and an embryonic lab.  

Mental Health Rehabilitation Retreat

Naples, ID

Healthcare  7,041 SF

Provided site documentation, scope verification, and invoice analysis following a water loss caused by freezing temperatures at a remote mental health rehabilitation retreat.

Crater Lake Lodge

Crater Lake National Park, OR

Hotel & Spa  57,208 SF

Provided site documentation, scope verification, project estimates, and invoice analysis. Power generators failed during heavy winter snowstorms at the remote and historic Crater Lake Lodge. The generator failure allowed numerous domestic water lines to freeze and break.

Residence Inn Hotel

Boise, ID

Hotel & Spa  330,000 SF

Provided site documentation, scope verification, project ROM's, and invoice analysis. The building suffered from multiple rainwater leaks during construction affecting twelve floors.

Pape Kenworth Truck Plant

Portland, OR

Industrial  61,750 SF

Provided Project Management and fire restoration Services. A truck fire caused building damages with heavy smoke damage throughout the structure. Remediation work saved 2.4 MM of anticipated building repair costs.

Semiconductor Material Supplier Plant

Portland, OR

Industrial  15,000 SF

Provided site documentation, monitoring, project ROM's, comp. estimates, and invoice analysis. The building manufactured proprietary semiconductor products and suffered heavy fire and smoke damage. Repairs occurred around production and required unique repair solutions.

Sundance Marina

Portland, OR

Industrial  98,250 SF

Provided site documentation, project ROM's, bidding packages, repair estimates, and invoice analysis. A dry dock storage facility for boats sustained heavy smoke damages to an adjoining building and critical fire damage to the main structure.

A Warehousing & Distribution Logistics Plant

Seattle, WA

Industrial  85,000 SF

Provided site documentation, monitoring, project ROM's, and invoice analysis. A warehouse distribution plant sustained notable fire damage when pallet contents spontaneously ignited during storage.

A Fruit Processing Plant

Wenatchee, WA

Industrial  90,000 SF

Completed an emergency restoration invoice review and provided analysis recommendations. Wildfires caused heavy fire and smoke damage to a fruit packing facility.

A Chemical Storage Warehouse

Woodburn, OR

Industrial  10,800 SF

Provided site documentation, monitoring, project ROM, the scope of repair drawings, and performed an invoice analysis. A pallet of agriculture chemicals spontaneously combusted damaging a chemical storage facility requiring environmental cleanup.

A Compound Bow Manufacturer

Walla Walla, WA

Industrial  16,000 SF

Provided a repair estimate and schedule. An industrial building designed for magnesium bow manufacturing suffered severe fire damage from a magnesium dust fire when shavings from the manufacturing process ignited.

Paper Product Manufacturer

Phoenix, AZ

Industrial  331,100 SF

Provided invoice and scope review following emergency services. Created a comprehensive expert report outlining recommendations on concrete slab dry down expenses and typical repair scope.

Omni Hilton Head Oceanfront Resort

Hilton Head Island, SC

Residential  225,000 SF

Provided site monitoring and documentation during emergency mitigation services. Hurricane Matthew damaged two adjacent, 5-story buildings at the Omni Hilton head resort.

St. Innocent's Academy

Kodiak, AK

Residential  7,800 SF

Provided emergency invoice analysis and recommendations. The building sustained heavy water damage after the roof blew off during a windstorm.

SERVICES

Project Estimating

Site Documentation

Project Management

Site Monitoring (Clerking)

Desk Reviews

Spherical & 3D Scanning

Site Takeoffs

Thermographic Inspections

Schedule Analysis & Review

Expert Reports

PROFICIENCIES
bottom of page